The Davie Shipyard, located in Lévis, Quebec, is undertaking projects to expand and optimize its industrial facilities. In this context, a study to assess peak power demand was commissioned to anticipate future electrical needs and ensure compliance with Hydro-Québec’s requirements (Red Book – Standard E.21-12).
The mandate entrusted to 3E Ing. specifically focused on analyzing the site’s peak load, including planned expansions and their impact on overall energy demand.