The Facilities Study is an essential step in obtaining authorization to connect an electricity generation facility to Hydro-Québec’s distribution network. Whether your project is connected at low voltage (LV) or medium voltage (MV), a rigorous technical analysis is required to ensure compliance with Hydro-Québec’s requirements and to minimize the risk of delays or unforeseen costs.
At 3E Ing., we assist developers, independent power producers, industrial companies, institutions, and municipalities with the complete preparation of their Facilities Studies.